Auronyx Power Stations

From greenfield
to grid.

Hybrid renewable plants developed, engineered, built and operated by one accountable partner — for the full 25-year life.

The Lifecycle

One partner,
four chapters

01
Develop · Years −3 to −1

Find the megawatts others miss

Siting models that overlay grid headroom, land, irradiance and market value — then permits, interconnection queues and offtake negotiated by people who've done it in twelve markets.

Site originationGrid studies PermittingPPA structuring
11.4 GWPipeline
78%Permit Success
02
Engineer · Year −1

Design for the revenue stack

PV-to-storage ratios, inverter loading and grid-forming capability chosen by simulating 30 years of market participation — not by copying last year's plant.

Hybrid sizingRevenue simulation Grid-forming design
30 yrMarket Simulation
+3.2 ptsIRR vs Static Design
03
Build · Year 0

Self-perform the critical path

Our own EPC crews on electrical balance-of-plant and commissioning — the two places where schedules slip and quality hides. Everything else, regionally partnered and ruthlessly audited.

EPCGrid connection CommissioningHSE
96%On-time COD
0.09LTIR (5-yr)
04
Operate · Years 1 to 25

Run it like we own it — often, we do

24/7 remote operations on Grid EMS, predictive maintenance from Core BMS analytics, and market revenue from Auronyx Trade — under one availability guarantee with teeth.

25-yr O&MAvailability guarantee Revenue managementRepowering
99.3%Fleet Availability
6.8 GWUnder Operation
0plants
Delivered to COD
0GW
Built Capacity
0markets
Grid Codes Mastered
02 Selected Work

Plants with stories

Atacama Desert · Chile

Cerro Lumen Hybrid

480 MWp of bifacial solar with 80 MWh of AX-Grid storage behind a single 220 kV connection. The world's driest desert; the fleet's highest capacity factor.

480 MWpSolar
80 MWhStorage
14 moBuild Time
2024COD
Hokkaidō · Japan

Kita Kaze Wind + Storage

112 MW onshore wind firmed by 160 MWh of storage, bid hourly into JEPX by Auronyx Trade. Curtailment cut from 11% to under 2% in the first year.

112 MWWind
160 MWhStorage
-82%Curtailment
2025COD
One contract, one accountable team — development through 25-year O&M. When something needs fixing, there's no one else to call.
RT Chief Investment Officer Infrastructure Fund
The Full Stack, On Site

Every station ships with the entire
Auronyx technology stack

Hardware and software, designed together — which is why our plants hit their models.

Auronyx Power Stations

Have land, grid
or ambition?

Co-develop, turnkey EPC or full divestment — we structure around your position.